ASME Section XI Division 2
Le prix original était : $480.00.$336.00Le prix actuel est : $336.00.
ASME Boiler and Pressure Vessel Code Section XI: Rules for Inservice Inspection of Nuclear Reactor Facility Components – Division 2: Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities
Édition 2023
Publié par ASME International, 07/01/2023
Description
ASME Section XI Division 2 provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.
Révision | Édition 2023 |
---|---|
Date de publication | 1er juillet 2023 |
Statut | Actif, le plus récent |
Langue du document | Anglais |
Publié par | ASME |
Nombre de pages | 152 |
Avis
Il n’y a pas encore d’avis.